Sign In | Join Free | My portofva.com
China Bestaro Machinery Co.,Ltd logo
Bestaro Machinery Co.,Ltd
Bestaro Cranes Serving the development of global industry
Verified Supplier

4 Years

Home > Double Girder Gantry Crane >

CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction

Bestaro Machinery Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction

Certification : CE

Place of Origin : Henan,China

MOQ : Negotiation

Price : Negotiation

Payment Terms : L/C, T/T

Supply Ability : 500 sets per year

Delivery Time : 45 workdays

Packaging Details : Export standard packaging

Keywords : Double Girder Heavy Duty Gantry Crane

Span : 5-40m or on request

Max. lifting height : 9m,12m,6m

Lifting load : 5~20T

Power source : 3 phase 380V 50hz or accord your requirements

Crane feature : Easy Operated Girder Bridge Crane

Application : Bridge Construction

Contact Now

CE Double Girder Heavy Duty Gantry Crane Bridge Construction

Introduction:

Double girder gantry crane composed of gantry, crane crab, trolley traveling mechanism, cab and electric control system, the gantry is box-shape structure, the track is at the side of each girder and the leg is divided into type A and type U according to user’s requirements. The control method could be ground control, remote control, cabin control or both, in the cab there are adjustable seat, insulating mat on the floor, toughened glass for the window, fire extinguisher, electric fan and auxiliary equipment such as air condition, acoustic alarm and interphone which can be furnished as required by users. This double girder gantry crane is beautiful design and durable and widely used in open-air warehouse, of course, also can be used indoors, but please let us know the condition in your workshop, just tell us your demands, we can design the most suitable crane for you.

Technical Parameter:

Capacity (ton) 5 10 16/3.2 20/5 32/5 50/10
Span (m) 18, 22, 24, 26, 30, 35
Lifting height (m) 10, 11, 12
Working class A5
Control way Cabin control or remote control
Power source 380V 50HZ 3phase (Could supply it as yours)
Trolley lifting mechanism

Lifting speed

(m/min)

Main hook 11.3 8.5 7.9 7.2 7.5 5.9
Auxiliary hook - - 14.6 15.4 15.4 10.4
Trolley traveling mechanism
Traveling speed (m/min) 37.3 35.6 36.6 36.6 37 36
Crane traveling mechanism
Traveling speed (m/min) 37.3 39.7 37.3 39.7 39.4 38.5
Motor power(KW) 40.8-51.8 41.5-52.8 80-77 84-81 99.3-117.3 126.5
Rail track recommended 43kg/m 43kg/m or QU70

Advantages:

1. Module control speed, micro-speed and double speed;

2. Traveling and lifting smoothly;

3. The power for trolley moving adopts flat cable, sliding smoothly;

4. Control box layout is reasonable, easy to repair;

5. Protection class IP55;

6. Optional main power source ;

7. All external cable line number with mark;

8. Safety smooth touch line, high conductivity, small pressure drop;

9. Light weight, installation convenience;

10. Set electric taxi speed is high, ensure continuing power supply;

11. Optional speed control module, and can realize the micro speed and double speed.

CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction

How to choose:

1. Selection of gantry crane

2. Span and cantilever length

3. The principle of determining the wheelbase

4. The gantry crane spacing size is determined

Photo:

CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction


Product Tags:

20Ton Double Girder Gantry Crane

      

Heavy Duty 5 ton gantry crane

      

5 ton free standing bridge crane

      
China CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction wholesale

CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Bestaro Machinery Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)